Home > steam boiler size depend on kilowatts

steam boiler size depend on kilowatts

About Us

Zozen Boiler main products include gas&oil boiler, coal-fired boiler, biomass boiler, thermal fluid heater and other series of more than 400 varieties of specifications.
Contact us for Email:[email protected]

Our Main Product

our main boilers
wns boiler picture

1-20 ton gas/oil fired boiler

Price: $12000-$450000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2 Mpa

Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

szs boiler picture

7-70 MW gas/oil fired hot water boiler

Price: $160000-$1800000/set

Capacity: 7-70 MW

Pressure: 1.0-1.6 Mpa

Fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, LPG, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, hospital, colleges and universities.

szl boiler picture

2.8-29mw coal fired boiler

Price: $70000-$750000/set

Capacity: 2.8-29mw

Pressure: 1.0-1.25 Mpa

Fuel: Bituminous coal, lean coal, anthracite

Industries: Heating, hotels, schools, hospitals

yyw boiler picture

horizontal thermal fluid heater

Price: $12000-$350000/set

Capacity: 700 - 14000 kw

Pressure: 0.8 - 1.0 Mpa

Fuel: natural gas, coke oven gas, bio-gas´╝îliquid propane gas, diesel, heavy oil, light oil, crude oil

Industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

dzl boiler picture

1-20 ton biomass fired boiler

Price: $12000-$350000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2.5 Mpa

Fuel: Biomass particles

Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital

Steam Heating Processes - Load Calculating - Engineering ToolBox

Calculating the amount of steam in non-flow batch and continuous flow heating processes. 20supo/supC to 75supo/supC with steam produced from a boiler with capacity 200 kW (kJ/s) of a pipe line depends on the size of the pipe and the steam pressure.

Sizing A Sussman Electric Steam Boiler | Sussman Electric Boilers

Sep 29, 2014 Use the following Table to determine KW Boiler rating when steam load and feed water temperatures are known.

boiler efficiency guide - Cleaver-Brooks

key factor is fuel usage or boiler efficiency. Boiler efficiency and are driven by fuel to steam efficiency and Boiler size, load . The efficiency of the boiler depends on the Natural gas cost is $0.83/Therm while electricity cost $0.09/KWh.

Sizing Cast Iron Radiator Heating Capacity Guide - Columbia Heating

which have central steam or hot water boiler systems but for the first half of this century cast iron radiators were the overwhelming favorite form of radiation.

ASK THE EXPERTS: Steam Electricity | Home Power Magazine

Are there any companies that make small boiler turbo generators (520 kW) that a 2 kW alternator, but its there for fun, not to depend on for backup electricity. . power plant steam boilers, they are ground down to uniform size and density.

How to Calculate the True Cost of Steam - Figure 2-3: Example

If the plant has only one steam generator (boiler), uses a single fuel, and has a One of the problems is that the cost of steam depends on the generation rate, Sludge to Disposal. Main Steam Header. Process. Vent A. Vent B. kW. BPST.

Industrial Combustion Boilers - iea-etsap

boiler size and power are the output steam mass flow rate, pressure and temperature. The amount of input fuel depends on the fuel energy content and on the overall energy .. provides an investment cost of $1381/kW, a fixed OM.

High Efficiency Electric Power Generation - MIT Energy Initiative

Generation efficiency (%) is 3600 (kJ/kWh) divided by Pulverized coal combustion in Supercritical steam boiler (PC/SC) with steam parameters: . Along the length of the tubes heat is added in both the furnace and in the convective .. The IGCC efficiency depends strongly upon the performance of the gas turbine and,

Cogeneration / Combined Heat and Power (CHP) | Center for - C2es

Steam turbines typically have capacities between 50 kW and 250 MW and work by combusting fuel in a boiler to heat water and create high-pressure steam, which [21] The cost of a cogeneration system depends on the level of complexity of for cogeneration systems per kilowatt of capacity decrease as size increases.

Steam Heating Processes - Load Calculating - Engineering ToolBox

Calculating the amount of steam in non-flow batch and continuous flow heating processes. 20supo/supC to 75supo/supC with steam produced from a boiler with capacity 200 kW (kJ/s) of a pipe line depends on the size of the pipe and the steam pressure.

Sizing A Sussman Electric Steam Boiler | Sussman Electric Boilers

Sep 29, 2014 Use the following Table to determine KW Boiler rating when steam load and feed water temperatures are known.

boiler efficiency guide - Cleaver-Brooks

key factor is fuel usage or boiler efficiency. Boiler efficiency and are driven by fuel to steam efficiency and Boiler size, load . The efficiency of the boiler depends on the Natural gas cost is $0.83/Therm while electricity cost $0.09/KWh.

Sizing Cast Iron Radiator Heating Capacity Guide - Columbia Heating

which have central steam or hot water boiler systems but for the first half of this century cast iron radiators were the overwhelming favorite form of radiation.

ASK THE EXPERTS: Steam Electricity | Home Power Magazine

Are there any companies that make small boiler turbo generators (520 kW) that a 2 kW alternator, but its there for fun, not to depend on for backup electricity. . power plant steam boilers, they are ground down to uniform size and density.

How to Calculate the True Cost of Steam - Figure 2-3: Example

If the plant has only one steam generator (boiler), uses a single fuel, and has a One of the problems is that the cost of steam depends on the generation rate, Sludge to Disposal. Main Steam Header. Process. Vent A. Vent B. kW. BPST.

Industrial Combustion Boilers - iea-etsap

boiler size and power are the output steam mass flow rate, pressure and temperature. The amount of input fuel depends on the fuel energy content and on the overall energy .. provides an investment cost of $1381/kW, a fixed OM.

High Efficiency Electric Power Generation - MIT Energy Initiative

Generation efficiency (%) is 3600 (kJ/kWh) divided by Pulverized coal combustion in Supercritical steam boiler (PC/SC) with steam parameters: . Along the length of the tubes heat is added in both the furnace and in the convective .. The IGCC efficiency depends strongly upon the performance of the gas turbine and,

Cogeneration / Combined Heat and Power (CHP) | Center for - C2es

Steam turbines typically have capacities between 50 kW and 250 MW and work by combusting fuel in a boiler to heat water and create high-pressure steam, which [21] The cost of a cogeneration system depends on the level of complexity of for cogeneration systems per kilowatt of capacity decrease as size increases.

GET Support & Price

Please Feel free to give your inquiry in the form below.We will reply you in 24 hours