Home > detail for boiler factory foundation

detail for boiler factory foundation

About Us

Zozen Boiler main products include gas&oil boiler, coal-fired boiler, biomass boiler, thermal fluid heater and other series of more than 400 varieties of specifications.
Contact us for Email:[email protected]

Our Main Product

our main boilers
wns boiler picture

1-20 ton gas/oil fired boiler

Price: $12000-$450000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2 Mpa

Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.

szs boiler picture

7-70 MW gas/oil fired hot water boiler

Price: $160000-$1800000/set

Capacity: 7-70 MW

Pressure: 1.0-1.6 Mpa

Fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, LPG, diesel, heavy oil, light oil, crude oil, etc.

Industries: Heat supplying, hospital, colleges and universities.

szl boiler picture

2.8-29mw coal fired boiler

Price: $70000-$750000/set

Capacity: 2.8-29mw

Pressure: 1.0-1.25 Mpa

Fuel: Bituminous coal, lean coal, anthracite

Industries: Heating, hotels, schools, hospitals

yyw boiler picture

horizontal thermal fluid heater

Price: $12000-$350000/set

Capacity: 700 - 14000 kw

Pressure: 0.8 - 1.0 Mpa

Fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

dzl boiler picture

1-20 ton biomass fired boiler

Price: $12000-$350000/set

Capacity: 1-20 ton/h

Pressure: 0.7-2.5 Mpa

Fuel: Biomass particles

Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital

To save forests, Kenyan tea factory brews new way to dry tea

Aug 3, 2015 THIKA, Kenya, August 3 (Thomson Reuters Foundation) - The first thing Makomboki employees feed the factorys boilers with briquettes of

86-erecting-manual_1.pdf (859.25 KB) - Weil-McLain

the draft hood collar at the factory must be adjusted during burner start up to A boiler foundation is recommended where the boiler room. oor is not level or

6500A IOM - Smith Cast Iron Boilers

assembled at the factory. Tapered threads are DETAIL OF CLEARANCE BETWEEN. DRUM AND place at front of boiler foundation and make each supply drum nipple into the .. The flue door and hinge assemblies are factory mounted.

Mills 4500A - Smith Cast Iron Boilers

Every detail of the 4500A Boiler Burner unit for oil and gas is the result of years of Each unit is backed by factory service technicians from a factory service force 4500A Mills header-type cast iron sectional boiler; Foundation front plate, with

CBL Specifications - Cleaver-Brooks

pFiretube boiler model CBL engineering specifications in an editable format. The boiler shall be completely preassembled and fire tested at the factory. The unit shall be ready for immediate mounting on floor or simple foundation and ready for .. your local Cleaver-Brooks authorized representative for efficiency details).

Classic furnaces - CLASSIC | Central Boiler

Measurements and Foundation Dimensions - Illustration Insulated Chimney - the chimney is a Type HT listed, factory-built chimney for wood-burning

constructing and manufacturing of new steam boilers - Interlok

We are constructing and manufacturing factory new steam locomotive boilers If a new foundation ring has to be fabricated and fixed by rivets, INTERLOK

John Zaharchuk | Chemical Heritage Foundation

The Ambler Boiler House is a successful Leadership in Energy and Now were they all part of the Keasbey Mattison factory, or were they . . Im not sure what the final planning details are going to be, but Im assuming thats all in the works.

Engineering Standards Manual: Standard Drawings Details

Sprinkler System Riser Detail - Backflow Preventer/Design Notes, 9/8/04 . Foundation Support System for Temporary Trailers-single wide [temporarily

To save forests, Kenyan tea factory brews new way to dry tea

Aug 3, 2015 THIKA, Kenya, August 3 (Thomson Reuters Foundation) - The first thing Makomboki employees feed the factorys boilers with briquettes of

86-erecting-manual_1.pdf (859.25 KB) - Weil-McLain

the draft hood collar at the factory must be adjusted during burner start up to A boiler foundation is recommended where the boiler room. oor is not level or

6500A IOM - Smith Cast Iron Boilers

assembled at the factory. Tapered threads are DETAIL OF CLEARANCE BETWEEN. DRUM AND place at front of boiler foundation and make each supply drum nipple into the .. The flue door and hinge assemblies are factory mounted.

Mills 4500A - Smith Cast Iron Boilers

Every detail of the 4500A Boiler Burner unit for oil and gas is the result of years of Each unit is backed by factory service technicians from a factory service force 4500A Mills header-type cast iron sectional boiler; Foundation front plate, with

CBL Specifications - Cleaver-Brooks

pFiretube boiler model CBL engineering specifications in an editable format. The boiler shall be completely preassembled and fire tested at the factory. The unit shall be ready for immediate mounting on floor or simple foundation and ready for .. your local Cleaver-Brooks authorized representative for efficiency details).

Classic furnaces - CLASSIC | Central Boiler

Measurements and Foundation Dimensions - Illustration Insulated Chimney - the chimney is a Type HT listed, factory-built chimney for wood-burning

constructing and manufacturing of new steam boilers - Interlok

We are constructing and manufacturing factory new steam locomotive boilers If a new foundation ring has to be fabricated and fixed by rivets, INTERLOK

John Zaharchuk | Chemical Heritage Foundation

The Ambler Boiler House is a successful Leadership in Energy and Now were they all part of the Keasbey Mattison factory, or were they . . Im not sure what the final planning details are going to be, but Im assuming thats all in the works.

Engineering Standards Manual: Standard Drawings Details

Sprinkler System Riser Detail - Backflow Preventer/Design Notes, 9/8/04 . Foundation Support System for Temporary Trailers-single wide [temporarily

GET Support & Price

Please Feel free to give your inquiry in the form below.We will reply you in 24 hours